Progress continues across 100 Chalk Farm Road, with the floor 5 slab for Block D and foundations for Blocks A and B now complete.

Work is continuing on Block D, with the floor 8 and 9 slabs progressing, alongside scaffolding, blockwork and MEP services on the lower levels. Bulk excavation in the northeast area of the site is also ongoing, alongside works to the basement slab for Blocks A, B and C.

Our two timelapse cameras continue to capture progress at 100 Chalk Farm Road and will document key stages throughout the development.

We look forward to sharing further updates as the project continues to move forward.